Factory and warehouse self-use
Three-phase solar and storage for daytime production, selected peak management and business-critical circuits.
Explore solution →Project-matched hybrid inverters, LiFePO4 batteries and commercial storage systems for Vietnamese distributors, EPC partners and installers.
Final configuration requires project-specific technical confirmationVietnam's Ministry of Industry and Trade publishes procedures for self-produced, self-consumed rooftop solar connected to the national power system. Ministry reporting also highlights continued rooftop solar deployment among electricity consumers. A battery project must be designed around the current legal route, export or non-export behavior, load profile, critical circuits and technical requirements of the relevant authorities and utility.
Three-phase solar and storage for daytime production, selected peak management and business-critical circuits.
Explore solution →Hybrid storage for offices, retail, hospitality, refrigeration, communications and essential services.
Explore solution →Off-grid inverter/chargers and scalable LiFePO4 batteries for farms, islands and facilities with constrained supply.
Explore solution →Provide daytime and night-time demand, maximum demand, operating schedule and starting surge for production and cooling equipment.
Define self-consumption, backup, peak management, generator reduction and whether export to the grid is permitted or prohibited.
Confirm phase, voltage, frequency, existing rooftop PV, equipment room, ambient temperature, humidity and ventilation.
Confirm the current notification or approval path, fire and construction requirements, utility interface and required equipment certificates.
Potentially, after the current project route, grid interaction, inverter requirements, protection and installer responsibilities are confirmed. Requirements can vary by project size and connection method.
It can when the operating strategy, interval load profile, inverter power, battery energy and site tariff objective are properly modeled. A final result cannot be promised without project data.
Yes. Three-phase hybrid and 30-125 kW commercial storage options are available for project matching and technical confirmation.
We will match the inverter, LiFePO4 battery and solar array for your technical confirmation.
Request a Proposal →