Country and site
Destination country, installation environment, altitude and typical ambient temperature.
For distributors, installers and project buyers across Africa and Southeast Asia. Use this checklist before requesting an inverter, battery or complete solar-plus-storage proposal.
Reliable selection starts with the load, required operating time and local electrical conditions—not only the inverter power printed on a quotation.
A complete proposal should coordinate PV input, inverter output, battery voltage and capacity, communication, protection, generator or grid behavior, and installation conditions.
Destination country, installation environment, altitude and typical ambient temperature.
Single or three phase, nominal voltage, frequency and whether grid and generator inputs are available.
Continuous load, largest starting surge, daily energy use and which loads must remain powered during an outage.
Required backup hours, acceptable generator runtime and whether daytime solar should recharge the battery.
Required quantity, target installation date, OEM requirements and expected future expansion.
Available roof or ground area, shading, panel orientation and expected local solar resource.
Then verify phase, voltage, PV range, battery compatibility and operating mode.
Then account for usable depth of discharge, conversion losses, reserve margin and future expansion.
Start with the maximum simultaneous load and the largest motor or compressor starting surge. The inverter must also match the site phase, voltage, battery platform, PV input window and required generator or grid functions.
A useful starting point is required load energy divided by allowable battery depth of discharge and system efficiency. Final capacity should also consider reserve margin, temperature, cycle-life target and future load growth.
A hybrid inverter is useful where solar, battery and grid power must be coordinated. An off-grid inverter is often selected where the system must operate independently and may use a generator as an additional charging source.
Confirm enclosure rating, installation ventilation, operating-temperature derating, corrosion exposure and protection against rain, dust and direct sunlight. Battery rooms and cabinets should follow the product installation requirements.
No. Grid voltage, frequency, phase arrangement, utility rules, climate, installation practice and certification requirements vary. Every export project should be checked against its destination market.