Verify phase and surge.
Confirm single or three phase, voltage, frequency, motor starting current, surge duration and temperature derating.
Turn a real load profile, backup target and local solar resource into a transparent first-pass system estimate. Every formula and assumption remains visible for review.
Last reviewed: 21 August 2026 · Planning calculations, not a final engineering design
Use measured load and local solar data whenever possible. Defaults reproduce the worked example in the SAVYEN sizing guide.
The calculator deliberately keeps the three sizing steps separate. This prevents daily energy, inverter power and battery runtime from being treated as the same rating.
Confirm single or three phase, voltage, frequency, motor starting current, surge duration and temperature derating.
Confirm battery voltage, BMS discharge current, CAN/RS485 protocol, firmware, settings, reserve and parallel rules.
Confirm cold-condition voltage, MPPT range, input current, module temperature, shading, orientation and poor-season production.
We will verify compatible inverter, battery, PV and protection options for the destination country.